WebThe static tipping load for the loader is 11,570 pounds. The soil being used for the backfill is a rock dirt mixture weighing 2,950 pounds per loose cubic yard. The average travel distance for the loader is 125 feet one way. The average loader speed when loaded is estimated to be 1.5 miles per hour and when empty 2.2 miles per hour.
Get a quoteWebUse the "Soil, previously excavated" option for calculating backfill. Use the 60 HP front end loader. The soil will be compacted in 8" lifts using a jumping jack. The contractor is responsible for supplying a bed of sand 6" above and below the electrical supply line. Use the Trenching and Backfill with Heavy Equipment
Get a quoteWebDec 22, 2013 · The original bowl that resulted from excavation still remains under the foundation and the lesser-compacted backfilled soil. When the water table rises or heavy rains or snowmelt cause the bowl to fill with water and the backfill to saturate, water at the bottom of the bowl creates upward pressure on the foundation, known as hydrostatic …
Get a quoteWebbackfilling is to backfill only after the basement floor slab and the first-floor deck are in place. For the deck, sill plates should be bolted down and joists nailed to the Backfilling with soil full of tree roots leaves a porous fill that can cause basement leakage. The fill can't be properly compacted and will settle with time.
Get a quoteWebB. Determine the density of soil in place by the sand cone method, ASTM D 1556, or by nuclear methods, ASTM D 2922 and D 3017. C. Determine laboratory moisture-density relations of soils by ASTM D 1557. D. Determine the relative density of cohesionless soils by ASTM D 4253 and D 4254. E. Sample backfill materials by ASTM D 75.
Get a quoteWebundisturbed soils or foundation backfill, except where structural trench support is necessary. 1. Dry Stable Trench: Stable and substantially dry trench conditions exist in pipe embedment zone as result of typically dry soils or achieved by ground water control (dewatering or depressurization) for trenches
Get a quoteWebbackfilling is to backfill only after the basement floor slab and the first-floor deck are in place. For the deck, sill plates should be bolted down and joists nailed to the Backfilling with soil full of tree roots leaves a porous fill that can cause basement leakage. The fill can't be properly compacted and will settle with time.
Get a quoteWebSep 26, 2005 · Basement backfill. I live in a area full of clay, compromised by weeks of drought followed by the flood of rain. This is hell on the average basement. To keep pressure off the basement wall, it is advised to wet the soil around the walls periodically to keep large cracks from appearing in the soil (clay). This will soon be rental property and I
Get a quoteWebUse the "Soil, previously excavated" option for calculating backfill. Use the 60 HP front end loader. The soil will be compacted in 8" lifts using a jumping jack. The contractor is responsible for supplying a bed of sand 6" above and below the electrical supply line. Use the Trenching and Backfill with Heavy Equipment
Get a quoteWebMy builder typically backfill with some stone and uses dirt for the rest. My excavator recommended a full stone 2B backfill. At first, the stone was only an additional $1,000 for 2 loads but now the excavator doing the backfill insists it will take 10 loads. Obviously, this is a huge price difference and the Contractor is redoing his math since
Get a quoteWebBackfilling refers to the process of replacing the soil that was removed during the excavation of slabs, foundations, and other groundwork. The process requires heavy equipment, skill, and knowledge of the soil conditions. Soil type, site parameters, and building design all determine the suitability of backfill during construction.
Get a quoteWebJul 1, 1998 · Backhoe-loader operators can backfill with the side of the backhoe bucket without damage to the machine. But they must follow three basic rules. Don't use the side of a backhoe-loader bucket to push material back into an excavation, say backhoe manufacturers. Backfilling using the swing circuit and dragging the bucket sideways can …
Get a quoteWebbackfilling is to backfill only after the basement floor slab and the first-floor deck are in place. For the deck, sill plates should be bolted down and joists nailed to the Backfilling with soil full of tree roots leaves a porous fill that can cause basement leakage. The fill can't be properly compacted and will settle with time.
Get a quoteWebSep 26, 2005 · To keep pressure off the basement wall, it is advised to wet the soil around the walls periodically to keep large cracks from appearing in the soil (clay). This will soon be rental property and I want to keep it as maintence free as possible. Any ideas? I was told by one of my instructors at the college to use engineered soil.
Get a quoteWebFeb 24, 2007 · Everyone has a 200 size hoe, 5-6' bucket, and it works so much better. The basement floors are not cut flat anymore. The operator digs 6-8" deeper arround the edge of the hole, the width of the bucket. This allows the footing to be placed in the trench, and will allow the builder to save 6" of rock across the entire floor.
Get a quoteWebB. Determine the density of soil in place by the sand cone method, ASTM D 1556, or by nuclear methods, ASTM D 2922 and D 3017. C. Determine laboratory moisture-density relations of soils by ASTM D 1557. D. Determine the relative density of cohesionless soils by ASTM D 4253 and D 4254. E. Sample backfill materials by ASTM D 75.
Get a quoteWebB. Determine the density of soil in place by the sand cone method, ASTM D 1556, or by nuclear methods, ASTM D 2922 and D 3017. C. Determine laboratory moisture-density relations of soils by ASTM D 1557. D. Determine the relative density of cohesionless soils by ASTM D 4253 and D 4254. E. Sample backfill materials by ASTM D 75.
Get a quoteWebJul 1, 1998 · Backhoe-loader operators can backfill with the side of the backhoe bucket without damage to the machine. But they must follow three basic rules. By Reinar Christian Download the PDF version of this article. (56.79 kB) Don't use the side of a backhoe-loader bucket to push material back into an excavation, say backhoe manufacturers.
Get a quoteWebWater in the soil close to the foundation will and can build up and find its way in, seeping through porous basement walls or through gaps and basement wall cracks. In fact, cracks often appear early in the life of a basement, formed during construction from the backfill striking the walls, sometimes before the concrete has completely cured.
Get a quoteWebAug 19, 2014 · Take that medium type soil into another pile, start another cut, cutting about 12 to 15 inches per basically like digging it out in layers. When you get to the hard pan clay put it in yet another pile. If this makes any sense to anybody. Usually it takes me about 16 hours with a 953 to dig a 8'10" deep basement about 1800 square feet.